Planning a bathroom remodel for 2027? It helps to look beyond a single “average cost” and understand what the work involves. Demolition, plumbing, tile, fixtures, permits, and labor each affect the final budget, and a change in layout or a hidden repair can shift it further.
For Denver-area planning, published estimates for a mid-range bathroom remodel often fall around $250–$450 per square foot. That’s a broad planning range, not a price promise. A small bathroom can still need expensive plumbing or tile work, while a larger space with a simple layout may cost less per square foot. The finish level, room size, existing conditions, and layout changes all matter. A real, written quote based on your project is the number that counts.
Below, we’ll walk through common line items and the places budgets can drift. The estimates are general industry references, not Farris General Contracting prices, and they shouldn’t be added together mechanically: estimates may group labor, materials, and project management differently.
1. Demolition and disposal
Typical planning range: about $800–$2,500.
This covers removing items such as an old vanity, tub or shower, tile, flooring, and wall materials, along with hauling debris away. The total depends on what’s being removed and how difficult it is to carry out and dispose of.
Older plaster, multiple layers of tile, or a tightly enclosed home can add time and disposal needs. One budget surprise is assuming demolition will reveal a perfectly sound surface. If the crew finds water damage or an unstable subfloor, repairs may be needed before new finishes go in.
Planning tip: Ask whether your estimate includes disposal and what happens if hidden damage is discovered. Clear answers make it easier to compare proposals.
2. Plumbing and electrical rough-in
Plumbing: roughly $2,000–$8,000. Electrical: roughly $1,200–$4,500.
Rough-in work is the behind-the-wall work that gets water, drains, wiring, and ventilation ready for the finished room. Replacing a fixture in the same location is usually simpler than relocating it. Moving a toilet, shower drain, or tub can require more labor and may involve opening walls or floors.
Electrical costs depend on what your plan calls for: new vanity lighting, outlets, a stronger exhaust fan, recessed lights, or dedicated wiring for features such as a heated floor. If the existing wiring or plumbing needs correction, that can affect the scope too.
This is where a layout decision can have a lasting budget impact. Keeping fixtures in roughly the same locations can reduce the amount of rough-in work, although the right choice depends on the room and your goals. If you’re still deciding on the arrangement, set aside time to review our article on bathroom layout, fixtures and finishes before finalizing the plan. Part 2 of this series takes a closer look at layout choices that add usable space.
3. Waterproofing and tile
Waterproofing: often around $1,500–$3,000. Installed tile: roughly $10–$42 per square foot in Denver-area estimates.
A shower needs more than attractive tile. The layers beneath it help manage moisture and protect the surrounding structure. A good plan accounts for the waterproofing system, preparation, tile installation, grout, and finishing details, not just the tile price on a showroom label.
Tile size and pattern influence labor. Larger, straightforward tiles may install more quickly than small mosaics, intricate patterns, or detailed niches. The amount of surface being tiled also matters: a tiled shower enclosure has a different scope from a full-height tiled room.

Because waterproofing is largely hidden once the job is finished, it’s worth asking how it’s included in the scope. Cutting corners here to save on visible materials can be a costly tradeoff later. For help narrowing down tile and other selections, see our guide to choosing materials for a kitchen or bathroom remodel.
4. Vanities, fixtures, and glass
Vanity: roughly $600–$3,500 for stock or semi-custom options. Shower glass: around $900–$2,800.
That vanity range can change with size, storage, construction, and countertop selection. Faucets, sinks, toilets, mirrors, lighting, showerheads, and accessories each add to the finish budget. A custom vanity or premium stone top may cost more than a standard, readily available option. A frameless glass enclosure also has a different price point from a basic shower curtain or simpler door.
These choices are a common source of budget creep because they tend to arrive one by one. It can help to make a simple selection list early: vanity, countertop, faucet, shower system, toilet, lighting, mirror, and glass. Then decide where you’d like to invest and where a practical, standard option works well.

Part 3 of this series takes a closer look at those fixture and finish decisions, and how they affect the schedule. You don’t need every selection finalized on day one, but having a clear allowance and a few preferred options makes it easier to keep the project moving.
5. Permits and inspections
Permit requirements and fees depend on the work and the local jurisdiction. A bathroom project that changes plumbing or electrical systems may have different requirements from a cosmetic refresh. Fees, plan review, and inspections can also vary across Denver and nearby cities.
Rather than assuming permits are unnecessary, or guessing at a fee, ask your contractor what the scope requires and who is responsible for coordinating approvals and inspections. Include permit costs in the budget from the start, and confirm whether they’re listed as a separate line item or included elsewhere.
6. Labor and project management
Labor is a substantial part of a bathroom remodel. National cost guides commonly put labor at roughly 40%–65% of the total, depending on project scope and how the estimate is organized. That may include demolition, plumbing, electrical, waterproofing, tile setting, installation, finishing, and coordination.
A general contractor’s services can include scheduling trades, tracking decisions, coordinating inspections, and keeping work aligned with the agreed scope. Those responsibilities may appear as a separate project-management line or be incorporated into other costs. When comparing bids, look at what’s included, not only the bottom line. A residential contractor who communicates clearly and plans the sequence of work can help reduce avoidable delays and confusion.
Farris General Contracting’s remodeling services include bathroom renovations, tile installation, fixture upgrades, waterproofing, and ventilation improvements. Good planning and quality craftsmanship in construction both matter, especially for work that will be covered up once the room is finished.
7. Contingency: planning for the unknown
A contingency of 10%–20% is a common planning cushion for renovation work. It isn’t a promise that you’ll spend that amount. It gives you room to respond if demolition uncovers water damage, the subfloor needs attention, or a chosen product changes the scope.
Keep contingency separate from your planned selections, and avoid spending it on upgrades before the existing conditions are understood. If it isn’t needed, that’s a good outcome.
Where bathroom remodel budgets tend to get away from homeowners
A few patterns are worth watching:
- Changing the layout mid-project. Moving fixtures can affect plumbing, electrical, schedule, and finishes.
- Choosing products before checking the full scope. A fixture may require extra wiring, a different valve, or a custom enclosure.
- Comparing bids with different assumptions. One estimate may include disposal or waterproofing while another leaves them out.
- Treating a per-square-foot number as a quote. Bathroom remodel cost per square foot is useful for early planning, but it doesn’t capture every detail of your room.
- Leaving no room for surprises. Older homes can have conditions that are hard to confirm until walls or floors are opened.
For broader reference, see Angi’s bathroom remodel cost guide and this Denver bathroom remodel cost overview. These are general published estimates; prices and scopes change, so use them as planning context rather than a substitute for a project-specific proposal.
A practical way to start your 2027 budget
Write down what you want to change, what you’d like to keep, and whether you’re considering moving any fixtures. Set a finish-level range for the vanity, tile, and shower system, then ask for a written scope that separates allowances from confirmed selections. Add contingency, and check what permits or inspections may apply to your project.
You can start small: gather a few photos, note what isn’t working in the current bathroom, and make a list of priorities. When you’re ready to discuss the project, contact Farris General Contracting to explore your plans. A real quote (based on your bathroom, layout, selections, and site conditions) is the only number that counts.